Maintenance And Care Of Scaffolding Steel Pipes
Nov 20, 2024
Leave a message
Maintenance of rack pipes: After the scaffolding construction is completed, the construction manager shall convene the technical, safety and construction team personnel, carry torque wrenches, and conduct appearance and actual measurement inspections.
Maintenance of rack pipe scaffolding:
1 Tightening and displacement reinforcement of wall connecting rods. For parts that affect the construction, the displacement change work shall be carried out only after the technical department formulates measures, and the operator shall not displace the wall connecting rods without authorization.
2 Observe the overall or local vertical deviation of the scaffolding, especially observe the four corners of the scaffolding and the two sides of the opening and breaking to see if they are skewed or sunken. If any abnormality is found, personnel should be organized immediately to reinforce it.
3 Carefully check whether the binding at the root of the dense mesh is loose and whether the net rope is broken. If it is found to be loose, it should be restored in time, and if it is found to be broken, it should be replaced in time.
4 Check the bamboo fences laid on the mat frequently, repair the broken tendons and strips in time, and fill the holes. And the binding points of each bamboo fence should be checked at the same time.
5. Supervise the stacking of materials by users so that they do not exceed the construction load. For scaffolding used for masonry, for example, stacking bricks: standard bricks should be less than three layers in a single row, and porous bricks should be less than four layers in a single row.
6. Remove materials, bricks, concrete blocks and other debris accumulated in dangerous parts of the scaffolding.